Begin to install our sod immediately after delivery. Start laying your sod along a straight edge such as a walkway or driveway. Butt joints tightly together, do not overlap sod. Stagger joints similar to rows of bricks on the ground. Use a sharp knife to cut and shape sod around curves, tress and borders, etc. Rolling your new sod with a roller will smooth and level your sod and press out air spaces below the sod.  This contact with the ground will help sod soil to ground soil contact immensely and provide healthy root establishment. Start watering within 30 minutes even if all the sod isn’t installed yet, to prevent wilting and drying. Never, never let the sod dry out and kill the tender grass roots.

READY TO ORDER?

Contact our home office at 615-628-7097

[/vc_column_text][/vc_column]
0

You may also like

Water Sod
Sod Preparation
Remove the old lawn

admin

Leave a Reply

Your email address will not be published. Required fields are marked *